2000-03-21

2000-2002 The Yerevan Central Heating-and-Power Plant

The Client:
Yerevan CHPP CJSC.

The Yerevan Central Heating-and-Power Plant. Repair of Reinforced Lining and Reconstruction of the Sprinkler of Cooling Tower № 1.

The following main scopes of works have been implemented:
1. Shotcrete
13312 m²
2. Concrete and reinforced concrete
151.2 m³
3. Installation of reinforcement
42.17 t
4. Steel structures
27.31 t
5. Plaster work
1520 m²
6. Pipe laying
140 t
7. Wooden structures
492 t
8. Preparation and mounting of sprinkler units of corrugated asbestos states
46478 m²