2001-04-22

2001-2003 Yeghegis SHPP Construction

The Client:
”Bazenk” CJSC

The works on the construction of a Small HPP have been carried out with due regard for seasonality on the following projects:

1. Head structures, the water intake;
2. Installation of penstock
3. Construction of HPP building
4. Installation of mechanical and power equipment;
5. Outdoor switchyard 35 kV;
6. Access roads and land development.

The following main scopes of works have been implemented:
1. Earthworks
195124 m³
2. Concreting and reinforced concrete works
5100 m³
3. The Penstock of Æ1420 mm
4.5 km
4. Insulation of pipeline
19802.4 m²
5. Installation of reinforcement and steel structures
196.6 t