2004-04-18

2004-2006 Talin SHPP Construction

The Client:
”Silvi & G” LTD
The following main scope of work was implemented:
1. The earthworks
32123 m³
2. Concrete and reinforced concrete
1510 m³
3. Installation of reinforcement
39.4 t
4. Steel structures
1100 t
5. Laying of pipelines
2604 m