2010-02-10

2010 Reconstruction of fish-protecting structures of Sevan HPP

The Client:
International Power Engineering Corporation
The following scope of work was implemented:
1. A reinforcing and concreting of piers and retaining walls
2. A reinforcing and concreting of pedestrian bridges
3. A reinforcing and concreting of sidewall matching
4. A reinforcing and concreting of the basin of pumping station;
5. A reconstruction of the transformer substation and of compressor house
6. Building up of the posts of hoist
7. Insertions in the grooves, linking the insertions
8. Removal of the soil- vegetable layer
2842.58 m³
9. Filling of large size debris
1956.03 m³
10. Pebble graveling of a two layered roadbed
650.54 m³
11. Sand layer of a two layered roadbed
650.54 m³
12. The concrete of retaining walls
477.74 m³
13. Gabion masonry
180 m³