2011-02-15

2011 Construction Works on the Head end of Getik SHPP on the Getik River

The Client:
“ANDG Stile” Ltd.

The design provided for the construction of the upstream floor, flush weir, spillway apron, cushion pool, flushing basin, settling basin and the fish pass.

The following scope of work was implemented:
1. Earthworks
5517 m3
2. Concrete and reinforced concrete
1106 m3
3. Construction of joints
122 m
4. Installation of reinforcement
44.39 t