After the reconstruction of drainage tunnel No. 2, the “ArmHydroEnergyProject Institute” CJSC developed the design for reconstruction of 628 meters long section of drainage tunnel No. 1, which prevented the landslide danger zone at Tala district of Dilijan Town.
Previously collapsed tunnel section was recovered. Driving, concrete laying, drainage holes drilling and injection volumes were done.